Mobil Producing Nigeria Unlimited has planned an NGL export terminal on the left bank of Bonny River. The project included..
read moreWave attack during a severe storm caused damage to the seawall. Svašek was asked to inspect the seawall and indicate corrective measures.
read moreStudy to investigate measures to reduce wave penetration and siltation into the harbour.
read moreAssessment of hydraulic and morphological conditions at fishing port Nouadhibou, Mauritania.
read moreA wave and morphodynamic model study using SWAN and Xbeach.
read moreDesign sandy breakwater strengthened by natural processes (longshore sediment transport), so a true “Building with Nature” solution (FINEL, SWAN, DUROS,HARES).
read morePrepare boundary conditions for the structural design of the reclamation works at Qatif, Tarut Bay.
read more