Nigeria LNG export terminal
![](https://www.svasek.nl/wp-content/themes/meijer-media/assets/images/diensten-icn.png)
Hydrographic surveys, Hydraulic design of marine facilities
![](https://www.svasek.nl/wp-content/themes/meijer-media/assets/images/opdracht-icn.png)
Nigeria LNG (joint venture of NNPC and Shell)
![](https://www.svasek.nl/wp-content/themes/meijer-media/assets/images/locatie-icn.png)
Bonny River, Nigeria
![](https://www.svasek.nl/wp-content/themes/meijer-media/assets/images/datum-icn.png)
1996 – 1998
For the export of gas, Nigeria LNG has developed a terminal on the left bank of Bonny River between Bonny Town and the ocean corner. The works include a loading jetty for large LNG-carriers and a jetty for material off loading, tug boats and passenger ferries in Bonny River.
The facilities were designed in 1996 and completed in 1998. In 2001 the facilities were extended by a second LNG loading jetty.
The following services were provided:
• Hydrographic surveys (topography, bathymetry, currents, waves, sediments)
• 2D numerical modelling of currents, waves and sediment transport (FINEL)
• Satellite imagery analysis on shoreline development
• Analysis of maintenance dredging volumes
• Determination of mooring loads (TERMSIM)
• Evaluation of navigational procedures
• Optimisation of lay out of marine structures
Bastiaan Les
Projectleader
![](https://www.svasek.nl/wp-content/uploads/2023/02/personeel-Bas-Les-1-369x294.jpg)
MORE INFORMATION ABOUT SVAŠEK OR OUR EXPERTISES?
Please contact us or make an appointment.
CONTACT US