Weak Link Breskens

DOWNLOAD PROJECT SHEET
Services:
SWAN wave modelling, detailed design sea defence
Client:
Scheldestromen Water Board and Zwakke Schakel project office
Location:
Breskens, the Netherlands
Date:
2011 – 2012

Design sea defence

The village of Breskens is located in the south-western part of the Netherlands at the entrance of the Western Scheldt. The sea defence of Breskens, in the vicinity of the former fortress Frederik Hendrik and the ferry harbour, is one of the weak links (Zwakke Schakels) of Zeeuws-Vlaanderen.

A weak link is a part of the sea defence that will no longer comply with the safety standards in the maximum scenario for sea level rise by now and 2020.

The numerical wave model SWAN is used for the derivation of the Hydraulic Boundary Conditions, the hydraulic conditions with an exceedance frequency of 1/4000 year. In the design a sea level rise of 60 cm is applied and in the SWAN-model the expected bathymetry in the design period is used. Moreover, detailed design conditions have been derived, which include the new knowledge on the design of stone revetments (Steentoets).

Svašek Hydraulics has written the design report of the sea defence. First, after consultation of all parties involved, a list of demands, wishes and boundary conditions has been formulated. With this list several alternatives have been developed and the selected design was engineered in detail (Steentoets, PC-overslag etc.).

To restore the recreation park and houses, the present sea defence will be relocated in a more seaward direction. In the vicinity of the former fort Frederik Hendrik, the wave overtopping and the crest height is reduced by a vertical wall and concrete elements of different heights (roughness elements). At the eastern side of the mooring location the new dike profile is optimised. Increasing the crest height and/or replacement of the toe of the dike is not necessary anymore.

The dike will be under construction in 2012. The biggest part of the work takes place in summer, between 1st April and 1st October. The winter period is considered storm season during which dikes must not be broken up.

© Illustration by Eric van Rootselaar, © Photo Beeldbank RWS.